This tower kit is designed specifically for the Primus Windpower “AIR” 30 and 40 wind turbines.  Two level structure, anchored with guy wire allows the use of lightweight tubing while providing plenty or resistance. The AIR tower kit includes a simple yet effective elbow/tee for its base. Combined with a short length of tubing this type of base eliminates the need for a concrete pad, base plate and a swivel for the base of the tower.
Primus Windpower-Primus 45′ Guyed Tower Kit
  • Cargar imagen en el visor de la galería, This tower kit is designed specifically for the Primus Windpower “AIR” 30 and 40 wind turbines.  Two level structure, anchored with guy wire allows the use of lightweight tubing while providing plenty or resistance. The AIR tower kit includes a simple yet effective elbow/tee for its base. Combined with a short length of tubing this type of base eliminates the need for a concrete pad, base plate and a swivel for the base of the tower.
  • Cargar imagen en el visor de la galería, Primus Windpower-Primus 45′ Guyed Tower Kit

Primus Windpower-Primus 45′ Guyed Tower Kit

Proveedor
PRIMUS WINDPOWER
Precio habitual
$636.00
Precio de venta
$636.00
Precio habitual
Agotado
Precio unitario
por 
Impuesto incluido. Los gastos de envío se calculan en la pantalla de pagos.

Due to global supply chain constraints lead times for shipments may be delayed. We are actively working with our suppliers to mitigate shortages and improve lead times. If you have questions, please contact your AMRtechnologiesInc. representative at 1-800-213-0227 or submit your question AMRtechsolar@gmail.com

 

Primus Windpower-Primus 45′ Guyed Tower Kit

Primus 45′ Guyed Tower Kit

Continuing with their approach of affordable and practical, Primus offers a series of simple and economical tower kits for the Air Turbines.

A tower and turbine should be located in an open area where the prevailing wind direction is unobstructed for several hundred feet.  Buildings, trees, and fencelines all create turbulence that will reduce the harvestable energy in the wind.

The 45′ tower kit sets the turbine at a healthy elevation to avoid the drag and turbulence developed by the ground.  Using a simple cross-piece as a base, and guy wires for structure, the tower is easily assembled and raised by two people.  THE STEEL PIPE IS NOT INCLUDED.  Purchase the appropriate pipe pieces locally.  Refer to the owner’s manual for specific instructions on the thickness and length of pipe to use.


This tower kit is designed specifically for the Primus Windpower “AIR” 30 and 40 wind turbines.  Two level structure, anchored with guy wire allows the use of lightweight tubing while providing plenty or resistance. The AIR tower kit includes a simple yet effective elbow/tee for its base. Combined with a short length of tubing this type of base eliminates the need for a concrete pad, base plate and a swivel for the base of the tower.

Anchors and pipe or tubing are not furnished with the kit so you have the flexibility to use the most appropriate components for the installation.
This kit includes galvanized steel cable, not stainless steel cable.
Fast Installation
It comes with a Gin Pole kit to help errect the wind turbine (Set Up Kit) ; 
Gin Pole kit does not include any tubing for the Gin Pole Mast;
You can buy together with turbine mast tubing from metal store
Tower mast must be 1.5 in. schedule 40 steel tubing
No Winching required
No Cement Base if not needed

Kit includes:   

Tower Base 1

Upper Wire set 1

Lower Wire Set 1

Tower Base Staples 23/8” x 1 ½” 

Bolts 3-3/8” 

Lock-nuts 3

Cable Thimbles 8

Cable Clamps 16

Items Not Included In This Kit:

Anchors (The type of anchors used will depend on the ground makeup at your tower site. This is
explained further in the “Anchors” section of this manual.)
Tubing for Tower and Gin Pole
Ground Rod and Clamp
Lightning Arrestor  (optional)
Junction Box and Adapter  (optional)
Flex Conduit and Fitting  (optional)
Electrical Wire
Wire Connectors (preferably copper split bolts)
Pipe Insulation (to prevent wire “rattle” inside pole)  (optional)
Electrical tape

Tower Setup Kit Parts List:
Gin Pole Cap 1
100’ Rope 1
Snap Links – Work Load Rated to 400# 3
8-foot Cable 1
3/8” x 1 ½” Bolt 1
3/8” Lock-nut 1

Mast Selection:

For pipe tube specifications please consider the wind speed resistance as the main mitigation factor in a relation tower height ( 45 Ft.) tube thickness and max win speed the tower will stand with no major impact on it.
.065 inch (1.65 mm) can stand up to 70mph for a 45 Ft. tower
.090 inch (2.3 mm) can stand up to 80mph for a 27 Ft. tower; Schedule 20
.140 inch (3.6 mm) can stand up to 900mph  for a 27 Ft. tower;Schedule 40

Air Wind Turbine Sitting and Positioning

The AIR wind turbine is designed to mount on tubing or pipe with a  nominal 1.875 – 1.900 inch outside diameter. This dimension enables  constructing a tower from a range of readily available materials including  1 1/2 inch Schedule 40 steel pipe and 2 inch SS-20 galvanized fence  tubing (0.090 inch wall thickness). Under no circumstances should plastic  pipe be used to construct a tower. The manufacturer has few tower designed in different range as  27 ft (8.3 m) Tower, 29 ft (8.8 m) Tower and 45 ft (13.7 m) Tower

The minimum recommended tower height is 25 ft (7.6 m) on open ground or 20 ft (6 m) above nearby obstructions. Try to locate the wind turbine in the “cleanest” turbulent free air as possible. Turbulence will reduce the efficiency of the wind turbine and may accelerate wear on rotating components.


 

This Product does not include Tax and shipping costs. International shipping is subject to regulations and Import Taxation of Country of destination.
AMRtechnologies Inc. Solar & Electrical Systems
Tel: (+506) 7037-8077 or Toll Free: 1(800) 2130227
Solar Systems in United States & Latin America
www.AMRtechsolar.com